Back to news
15 May 2015 | News

A preliminary assessment of potential lower Pisan landslide dam outburst flood

0 mins Read

70% Complete

In the aftermath of the 7.8 Gorkha Earthquake that struck Nepal on 25 April 2015, numerous landslides have occurred in the steep mountains and hills throughout the earthquake impacted zone. The attention of a large number of scientists within Nepal and outside Nepal, namely National Aeronautics and Space Administration (NASA),United States Geological Survey (USGS), Chinese Academy of Sciences (CAS) and Utrecht University has been drawn to the potential secondary risks that might arise in the future. These geohazards include landslide‐dammed rivers, future mass movements (landslides/debris lows), glacial lake moraine failures, and avalanches. On the request of the Office of Prime Minister and Council of Minister, Government of Nepal, ICIMOD provided a preliminary report on Geohazards in the aftermath of 25 April 2015 (12 Baisakh 2072) earthquake. The report was based on the analysis done by ICIMOD and the agencies listed above and highlighted six landslides as potentially risky and recommended continued monitoring. Among them was the landslide in Lower Pisang village in Manang District in Gandaki zone which was considered to be at high risk.

The report can be downloaded here.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

related contents

Continue exploring this topic

27 May 2015 News
How big earthquakes rattle spring dynamics

The massive 7.6-magnitude earthquake that hit Nepal on 25 April has left unprecedented damage in life and property. The epicenter ...

21 Feb 2018 KSL
Manual on Planning Management for Ecosystem Services Launched

The operations manual can be of use in most terrestrial environments of the world. Its purpose is to include ecosystem ...

19 Feb 2016 News
Visiting Climate Smart Village

  A high-level delegation visited ICIMOD and CEAPRED’s pilot implementation on climate smart villages (CSV) in Patlekhet and Kalchebesi in Kavrepalanchok ...

19 Dec 2016 News
ICIMOD partner receives award for Resilient Mountain Village

The Center for Environment and Agricultural Policy Research, Extension and Development (CEAPRED) received the Adaptation at Scale Prize, Protsahan ...

13 Jun 2017 Atmosphere Initiative
Studying the Contribution of Indoor Emissions to Outdoor Air Quality

The team used two sets of instruments to measure particulate matter (PM2.5), black carbon (BC), carbon dioxide (CO2), carbon monoxide ...

16 Aug 2017 News
Engaging the Private Sector in Nuwakot

The participants were given a brief background of the Dhungetar Reconstruction Project. This was followed by an interaction with the ...

19 Oct 2015 News
ICIMOD Proposed to Host Web-based Hazard Platform

  In Nepal, landslides are one of the most common natural hazards, causing serious economic damage and affecting thousands of vulnerable ...

4 Apr 2018 Himalica
ICIMOD and SAPLING Project of HKI Collaborate to Promote Beekeeping in Ruma upazila, Bandarban

Encouraged by this result, the Himalica initiative sought collaboration with the Sustainable Agriculture and Production Linked to Improved Nutrition Status, ...