This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
As an informal knowledge and research network of national and international researchers working in the upper part of the Indus basin, the Upper Indus Basin Network (UIB-N) continually aims to coordinate research on climate, cryosphere, water, hazards and vulnerability, and adaptation-related issues. To further expand and strengthen the network’s activities in Afghanistan, the Third Upper Indus Basin Network – Afghanistan Chapter (UIBN–AC) Meeting was organized at the ICIMOD headquarters, Kathmandu, on 18 January 2019 – on the second day of the Second Regional UIB-N Workshop on “Enhancing Science-Based Regional Cooperation”. The meeting was organized by the International Centre for Integrated Mountain Development’s (ICIMOD) Strengthening Water Resources Management in Afghanistan (SWaRMA) Initiative and supported by the Governments of Afghanistan and Australia and the Commonwealth Scientific and Industrial Research Organisation (CSIRO).
1 min Read
The UIBN–AC Meeting was primarily held to recap previous meetings, discuss the progress made by the country chapter’s Technical Working Groups (TWGs), and deliberate on its next steps. The meeting involved 10 participants from Afghanistan representing the Ministry of Agriculture, Irrigation and Livestock, Ministry of Energy and Water, National Environmental Protection Agency, Kabul Polytechnic University, and Kabul University.
The TWG Leads presented their progress and issues faced. Participants also discussed the possible ways for addressing the gaps in data quality, availability, and sharing. This included involving more partners in the TWGs; developing a standard methodology/approach for data collection and sharing; presenting the concerns of TWGs to the Technical Secretariat of Land, Environment, and Water; and coordinating with relevant agencies and requesting them to share available data. The Strategic Committee Meeting of the UIBN–AC targeted 16 February 2019 for the next meeting (to be held in Kabul), in which each TWG will present clear work plans and a list of additional members.
The UIBN–AC’s activities following previous UIBN–AC Meetings have increased interest in membership and contributed to the work of the six TWGs. The country chapter has made excellent progress in a short period of time through efficient coordination among organizations and institutions.
Share
Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.
RELATED CONTENTS
To address rural energy problems, twenty seven villagers from Kyang Taung, Kyang Nur, Pantin, Thyetpin, Antpet and Zeyar, Myanmar were ...
Virtual reality for tourism, a crop database, a landslide warning system, and documentaries on Himalayan environments… these four topics took ...
Glacial Lake Outburst Floods (GLOFs) are one of the most serious natural hazards in mountain regions, including the Upper Koshi ...
A Partner Relationships Management (PRM) System Version 2.0 was launched coinciding with planning and review meeting of the International Centre ...
#塑战速决 (#BeatPlasticPollution) –今年世界环境日的三项行动 似乎没有任何地方可以免受塑料污染浪潮的影响:即使是地球之巅。上周在当地社区、登山者和政要前往纪念珠峰人类首登 70 周年时,ICIMOD 发起了我们新的 #拯救我们的雪(#SaveOurSnow)活动——一段视频显示被留在珠峰(南坡)大本营的堆积如山的塑料制品和其他垃圾的消息迅速传播开来。 但我们这代人可以扭转塑料潮流吗?随着谈判代表离开巴黎,同意起草一份具有国际法律约束力的条约草案以终结塑料污染,而在设立世界环境日的50周年呼吁采取集体行动来抵制它,有充分的理由充满希望。 同样重要的是,我们有充分的理由采取行动:塑料工业不仅是世界上增长最快的工业温室气体来源,而且塑料废物极大地加剧了兴都库什-喜马拉雅地区现有的气候变化、生物多样性丧失和污染等问题,ICIMOD 的 南亚网络开发和环境经济学(South Asian Network for Development and Environmental Economics ,简称SANDEE)。原因如下: 气候:固体废物——其中大部分是塑料——堵塞了排水系统,并增加了破坏性洪水,即由全球变暖引发的更频繁且更强烈的降雨事件引发的洪水。 生物多样性:塑料垃圾可能需要数百年才能分解,它们堵塞水道,其中的有害化学物质渗入土壤和水中,影响陆地和水生生物、生态系统和人类健康。 ...
The first atlas of its kind, this new publication offers a comprehensive, regional understanding of the changing climate ...
Through PhotoHKH, ICIMOD hoped to draw attention to change happening in the mountain areas of the Hindu Kush Himalaya and ...
Langtang Village in November 2014 and 2015. The earthquake in April 2015 triggered ...