Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

12 Oct 2015 News
Team visits climate smart Indian cardamom farms

  Wanting to know more about sustainable management practices of cardamom produc-tion, a team of six from the International Centre for ...

23 Sep 2015 News
Kathmandu University MS Glaciology students present research proposals

Eight students from Kathmandu University were invited to ICIMOD 21 August 2015 to present their research proposals to a panel ...

14 Aug 2015 News
EU and ICIMOD intensify collaboration

A joint meeting of delegations from the EU and ICIMOD expressed satisfaction on the progress made by the EU-funded programme ...

27 Mar 2015 News
Mobile based Crop Advisory System for Nepal

Experts from the International Centre for Integrated Mountain Development (ICIMOD) and the Government of Nepal came together to brainstorm on ...

30 May 2017 News
Soil Erosion a Serious Concern in the Koshi Basin

Published in 2016, the study showed that the soil loss rate estimated was 22 million tonnes per hectare of barren ...

8 Apr 2016 News
Teesta Basin Visit Reveals Spring Knowledge Gaps

HI-AWARE researchers from the International Centre for Integrated Mountain Development (ICIMOD), The Mountain Institute-India and local organisations recently visited Santook ...

24 Sep 2015 News
Helping flood information reach communities

Strengthening the capacity of satellite-based flood forecasting using near real time Jason-2 satellite altimeter data under SERVIR-Himalaya Small Grants Programme, ...