Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

13 Dec 2017 News
Field excursion to Sikkim’s spring revival sites

The International Centre for Integrated Mountain Development (ICIMOD) organized a filed excursion for 15 Bhutanese representatives to spring revival sites ...

1 Oct 2016 News
Paper Publication on the Discourse of Cilmate Change and Human Mobility

Should we be concerned over the impacts that climate change could have on human mobility? For many, the answer is ...

24 Sep 2015 News
Helping flood information reach communities

Strengthening the capacity of satellite-based flood forecasting using near real time Jason-2 satellite altimeter data under SERVIR-Himalaya Small Grants Programme, ...

Workshop to improve brick kiln policy and technologies

A workshop on Brick Kilns Policy and Advocacy Network (PAN) was jointly organized by Climate and Clean Air ...

16 Dec 2013 News
White paper launched on COP 19 sidelines

The International Centre for Integrated Mountain Development (ICIMOD) supported the launch of the Association of International Research ...

15 Sep 2016 News
HI-AWARE at the ’33rd International Geographical Congress’, 2016

Amina Maharjan, agricultural economist, and migration specialist with HI-AWARE, participated in the 33rd , held in Beijing between 21-25th August ...

26 May 2015 News
ICIMOD raises mountain issues at World Water Forum

The 7th World Water Forum was held from 12-17 April 2015 in Daegu and Gyeongbuk, ...

Emissions Study to Differentiate Characteristics of Paddy and Wheat Crop Residue Burning

Mehra collected wheat residue samples from the same districts, Kapilvastu and Rupendehi, where she had collected the paddy residue samples ...