Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

17 May 2017 News
Using Geospatial tools Towards Effective Preparation of LAPAs

ICIMOD provides technical guidance and support on using geographic information system (GIS) tools in planning at the sub-watershed level to ...

1 Dec 2016 KSL
Kailash Promoted as a Transboundary Brand at the 14th National Handicraft Trade Fair in Kathmandu

[caption id="attachment_7820" align="aligncenter" width="560"] The launch of the allo community training manual[/caption] The Kailash ...

18 Jul 2019 News
Combining top–down and bottom–up: Designing a watershed management plan for Dhankuta Municipality

In the first consultation meeting with the vice mayor, there was a consensus that the conservation of water sources is ...

12 Oct 2015 News
Scientists assess wetland ecosystems services on top of the world

  In August 2015, a team consisting of experts from China’s Yunnan Institute of Environmental Sciences and ICIMOD carried out a ...

14 Aug 2015 News
EU and ICIMOD intensify collaboration

A joint meeting of delegations from the EU and ICIMOD expressed satisfaction on the progress made by the EU-funded programme ...

Building Partner Capacity: Training on the Operation and Maintenance of Air Quality Instruments

The International Centre for Integrated Mountain Development (ICIMOD) conduced its first regional workshop on Air Quality Instrument Operation and Maintenance ...

30 Jul 2018 HI-RISK
Communicating flood early warning in the Ratu watershed

The team’s first stop was Bardibas, where ICIMOD has set up a community-based flood early warning system (CBFEWS) on the ...

15 May 2015 News
Impact of Nepal Earthquake 2015 on Langthang Valley

  The 7.8 magnitude Nepal earthquake on April 25, 2015 and subsequent aftershocks caused more than 8,500 fatalities, nearly 22,500 injured, ...