Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

24 Jan 2019 HI-RISK
Regional water-related disaster experts discuss gaps in flood early warning communication and potential solutions

In his welcome remarks, Basanta Shrestha, Director of Strategic Cooperation at the International Centre for Integrated Mountain Development (ICIMOD), emphasized ...

11 Jun 2015 News
National partners from India trained on participatory natural resources management planning

From 11–18 May 2015, a workshop was held in the Indian part of the Kailash Sacred Landscape (KSL) to facilitate ...

6 Jun 2016 News
Understanding the Mass Balance of Yala Glacier

At an elevation of 5250 metres above sea level, a bamboo stake, about an arm’s length, stuck out oddly against ...

6 Feb 2015 Cryosphere
Master Programme Thesis

Florencia Matina Tuladhar completed her thesis on “Determination of factors influencing recession ...

Code of conduct being formalized for gender and social inclusion in the brick sector

A national consultation workshop on a social Code of Conduct (CoC) for Nepal’s brick sector was held in Kathmandu on ...

30 Apr 2020 Cryosphere
New study finds that crevasses in Himalayan glaciers can play a key role in influencing ice temperature

Glaciers in cold and arid climates, such as in High Mountain Asia, can warm up much faster than expected because ...

31 Aug 2017 News
ICIMOD and UCAS Symposium on Resilience in the HKH at International Congress of Ecology

Eklabya Sharma, the Deputy Director General of ICIMOD, delivered a keynote speech at the conference. Sharma talked about the importance ...

26 May 2015 News
Indian farmers meet local entrepreneurs in Dadeldhura

ICIMOD and the Central Himalayan Environmental Association (CHEA) organized a five-day visit for the farmers/ beekeepers and the staff of partner organization ...