Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

22 Jul 2015 News
Community members speak of change in perception

On 14 July 2015, community members from the village of Dapcha in Nepal’s Kavre District gathered in a circle near ...

2 Jan 2015 News
International Conference on Mountain People Adapting to Change completed

The event brought together over 300 climate scientists, adaptation policy makers, and practitioners with the goal of finding more holistic ...

6 Apr 2016 News
World Water Day-2016 ‘Water and Jobs’

‘Water and Jobs – Empowering Young Professional’ was the theme for the 2016 World Water Day celebration program, highlighted the ...

A New Way Forward for Brick Kilns in Nepal

  The destruction of brick kilns caused by the massive earthquake earlier this April damaged approximately 110 chimneys in the valley. ...

Building Partner Capacity: Training on the Operation and Maintenance of Air Quality Instruments

The International Centre for Integrated Mountain Development (ICIMOD) conduced its first regional workshop on Air Quality Instrument Operation and Maintenance ...

6 Feb 2015 News
Workshop on Glaciological Applications of Unmanned Aerial Vehicles

A total of 50 participants from 15 institutions participated in the workshop, which focused on the scientific/natural hazard applications of ...

8 Mar 2017 Blog
Kalchebesi’s Real Entrepreneurs: Women Spearheading Adaptation to Climate Change

Many experts and researches have claimed that women suffer the impacts of climate change more than men do. This is ...

29 Jul 2015 News
Hands-on training on Flood Early Warning System

A five-day regional hands-on training on community-based flood early warning system (CB-FEWS) was organized in Kathmandu, Nepal, from 8-12 June ...