Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

5 Feb 2024 News
Personal visit by Director-General of FAO signals new era in cooperation

The MOU commits both bodies to pool expertise, knowledge, innovation, technology and networks to strengthen food production and community resilience, ...

Piloting of the Biodiversity Monitoring Protocol for REDD+ conducted in Parsa Wildlife Reserve, Nepal

Though a few biodiversity monitoring manuals and guidelines from the Government of Nepal (GoN), National Trust for Nature Conservation (

10 Feb 2015 News
Climate Change in Downstream Areas of the Indus River Basin: Local Perceptions and Adaptation Measures

Likewise, indirect impacts like losses to agriculture and livelihoods due to erratic rains in high altitudes may result in increased ...

22 Sep 2017 Solar Pumps
Nepali Engineers Explore New Irrigation Systems

Thirty irrigation engineers—10 of them women—from DOI participated in the training. Titled Energy Efficient Irrigation Systems using Solar Pumps, the ...

27 May 2015 News
How big earthquakes rattle spring dynamics

The massive 7.6-magnitude earthquake that hit Nepal on 25 April has left unprecedented damage in life and property. The epicenter ...

Reducing Pollution from Motorcycles

The air in Kathmandu is extremely polluted, with fine particles (PM2.5) being the major cause of concern.  If you ask ...