Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

31 Oct 2017 Himalica
Regional Workshop on the Himalica Project in Taplejung Deemed a Success

Key highlights of the workshop were: eight presentations on topics such as large cardamom, ecosystem services assessment, and bee pollination ...

When the levee breaks: Reducing GLOF risks through dam breach modelling

Given the Koshi basin’s susceptibility to disasters, many communities near the Koshi River are constantly at risk. In a bid ...

21 Jan 2020 News
Balancing hydropower development and freshwater ecosystem conservation in Nepal

Freshwater ecosystems such as lakes, rivers, streams, springs, and wetlands provide various direct and indirect services. They are a critical ...

5 Dec 2015 Uncategorized
ICIMOD Becomes an Observer in the IOM Council

ICIMOD became an Observer in the International Organization for Migration (IOM) Council during its 106th Session, which was held ...

1 Jan 2016 News
Linking Gender and Social Inclusion to Value Chain Development

Two gender and social inclusion experts from the International Centre for Integrated Mountain Development (ICIMOD) participated in a value chain ...

28 Sep 2016 News
Upper Indus Basin (UIB) Network Moots in Islamabad

The Technical Working Group (WG) and Strategic Committee Meetings of Upper Indus Basin (UIB) Network met 5 ...

4 May 2016 News
REDD+ Gorkha International TV coverage

At the request of Deutsche Welle (DW) television service, a team from ICIMOD and DW, travelled to Ludhi Khola watershed in Gorkha, ...

9 May 2017 News
ICIMOD Hosts 3rd CARIAA Annual Learning Review

HI-AWARE as part of the larger Collaborative Adaptation Research in Africa and Asia (CARIAA) organized its third Annual Learning ...