Back to news
4 Jul 2016 | News

P3DM in Nepal

1 min Read

70% Complete

The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. The programme was organised by Strategic Cooperation, International Centre for Integrated Mountain Development (ICIMOD) with the support of IDRC, Canada and technical guidance from ICIMOD’s geospatial team.

The P3DM model was built with the active engagement of local communities to address water, land, and other resource management issues for livelihood security, climate change adaptation and focused on reconstruction after the 25 April 2015 earthquake. The village community and ICIMOD professionals discussed the usability of P3DM. ICIMOD experts also visited the model built for the Dhungetar Earthquake Reconstruction and Rehabilitation Pilot Project site.

Model in the process without detail information

In orientation introduced participants to map reading, objectives of P3DM, and processes of model building. There were total 14 participants (2 resource persons: Govinda Joshi and Gauri S. Dangol, 1 Intern from ICIMOD and 11 community participants – five women/six men).

The model covered roads, trails, houses, schools, temples, springs and land use (homestead, farm lands for agriculture and forest). At each stage of development, the model was verified with village leaders as well as participants. After completing the model, the usability aspect of the model was discussed with participants.

Community members found P3DM useful for understanding the area, planning for reconstruction and development post-earthquake, solving their problem and for communicating with the planners and policy makers as well as for visitors understanding the area easily.

Model Specifications

Location Dhungetar, Charghare VDC, Nuwakot
Size of the model: 4’-00” x 5’-00”
Ground distance 1.829 km x 2.286 km
Area 4.18 sqkm. (418.1 hectares)
Horizontal scale (x, y) 1:1,500
Vertical exaggeration (z) 1.5
Contour interval 10 metres
Minimum height 510 metres
Maximum height 1060 metres
Height difference 550 metres

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

31 Aug 2017 News
ICIMOD and UCAS Symposium on Resilience in the HKH at International Congress of Ecology

Eklabya Sharma, the Deputy Director General of ICIMOD, delivered a keynote speech at the conference. Sharma talked about the importance ...

19 Dec 2015 News
India-ICIMOD Week 2015

  The Ministry of Environment, Forests and Climate Change (MOEF&CC), GB Pant Institute of Himalayan Environment and Development (GBPIHED), and the International ...

Linking Pilot Interventions to Policy Formulation

Large cardamom is a high value cash crop and a leading source of livelihood for a large number of people ...

11 Dec 2018 HIMAP
Mountains Matter in the IPCC Sixth Assessment Report Cycle

But things are changing. The Sixth Assessment Report (AR6) of the Intergovernmental Panel on Climate Change (IPCC) will feature a ...

30 Jul 2015 News
Using tablets for real-time data collection

Socio-economic data collection through household surveys need huge investment in time, human resource, and cost. When one of these is ...

13 Nov 2018 CryoHub
ICIMOD’s partners in Nepal hail successful cryosphere research collaboration

In collaboration with the Department of Hydrology and Meteorology (DHM), the Water and Energy Commission Secretariat (WECS), Tribhuvan University (TU), ...

12 Feb 2015 News
ICIMOD participates in the SAARC Working Group on Monsoon Meeting

At the second SWGM meeting, which was jointly organized by SAARC Meteorological Research Centre (SMRC) and the India ...

10 Feb 2015 News
ICIMOD helps develop rangeland policy for Khyber Pakhtunkhwa, Pakistan

Rangelands in the HKH reflect diverse geography and culture shaped both by past and present drivers of change. Rich in ...