Back to news
25 May 2016 | News

Developing Nepal’s Hydropower Potential

2 mins Read

70% Complete

Significant contributions in drafting and presenting ‘Hydropower Environmental Impact Assessment Guidelines (HP-EIA) of Nepal’ to the Government of Nepal (GoN) and stakeholders on 20 May, 2016 were made by the International Centre for Integrated Mountain Development’s (ICIMOD) Koshi Basin Initiative and International Finance Corporation (IFC). By helping developers manage environmental and social risks and impacts, and guard against unforeseen risks and impacts that could interrupt project execution, legal claims and any critical issues, the guidelines are key to any hydropower development.

In 2014, ICIMOD undertook the study ‘Basin-wide Strategic Environmental Assessment to Support Sustainable Hydropower Development’ which was based on the analysis of strategic level Policy Plan and Programme documents related to hydropower development and interviews with stakeholders. As a result, ICIMOD and IFC were requested by the Ministry of Population and Environment (MOPE), Nepal to collaborate with relevant ministries of Nepal in preparing the guidelines.

Inaugurating the consultation meeting, Bishwa Nath Oli, secretary of MOPE said that GoN has large aspiration to develop hydropower in a short time span and these guidelines form an integral part of developing hydropower. Mr Oli praised the support provided by IFC and ICIMOD to ensure sustainability of hydropower development in Nepal. Deputy Director General of the Department of Electricity Development, Nabin Raj Singh, thanked MOPE for their efforts and hoped it will continue to support to maximise local development benefits, and greater acceptance of projects by local communities and governments.

In her opening remarks, Ainsley Hemming, Second Secretary, Development Cooperation of the Australian Embassy, expressed her government’s commitment to support sustainable hydropower development in Nepal and congratulated the GoN for considering social and environmental impact assessment an integral part of the hydropower development process.

Eklabya Sharma, Director of Programme Operations from ICIMOD, said the new HP-EIA guidelines were prepared through a participatory process ensuring environmental impact assessments can be conducted quickly and efficiently, and are aligned with international performance standards, helping in expediting the government approval process. He gave his assurance ICIMOD will continue to provide support to GoN in updating and reforming environmental monitoring and regulatory framework and building government agency capacity to enhance their environmental oversight capabilities and attract investment opportunities.

The draft HP-EIA has been developed based on extensive gap analysis of existing Nepali EIA guidance documents and relevant legislation and comprehensive stakeholder consultations with local government, developers and EIA practitioners. These gaps included inadequate engagement of stakeholders; inadequately defined areas of influence and study areas, insufficient identification of baseline studies required to carry out EIA; not enough socio-economic and socio-community baseline studies; lack of knowledge on identifying and quantifying impacts; lack of precision on impact predictions, and inadequate alternatives analysis.

The HP-EIA provides guideline for each priority area in a simple checklist-based format in a clear and concise structure. This format aims to ensure guidelines are user-friendly and readily adopted by EIA practitioners, regulators, and hydropower developers in Nepal. Ideally, these new guidelines will improve financial and operational performance by optimising the management inputs such as water and energy, minimise negative impacts on ecosystem and maximise development benefits leading to a more efficient and cost-effective development and operation of hydropower projects.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related content

Continue exploring this topic

24 Jul 2015 News
SERVIR’s new science in forest fire management gets wider acceptance

The South Asian Forum for Environment (SAFE) intervention on forest fire,with support from ICIMOD’s SERVIR-Himalaya Small Grants Programme, has two strong ...

12 Dec 2016 News
“A Song for Barpak” Takes ICIMOD Prize at the Kathmandu International Mountain Film Festival

With stirring images and stories from before and after the devastating 2015 Nepal earthquake, director Pradip Pokhrel conveys a powerful ...

CCAC to support brick study in Nepal

The 7.8 magnitude earthquake that hit Central Nepal on 25 April 2015 and the more than 300 aftershocks that followed, ...

10 Jan 2017 News
Partnerships for Transformative Change

The International Centre for Integrated Mountain Development (ICIMOD), in association with the Partnership Brokers Association (PBA), is ...

24 Sep 2015 Forests
Improved methods to measure forest above-ground biomass in the Hindu Kush Himalayan region through satellites

The study of forest above-ground biomass (AGB) for estimating the carbon stock in each tree is important, as it is ...

13 Jan 2020 Cryosphere
International forum spotlights need for collaborative, transdisciplinary cryosphere research in the Hindu Kush Himalaya

One hundred and twenty leading experts, practitioners, and stakeholders from the region and beyond attended the three-day forum. They discussed ...

Findings and learnings from the WeACT project in the Upper Koshi Basin

Glacial Lake Outburst Floods (GLOFs) are one of the most serious natural hazards in mountain regions, including the Upper Koshi ...

16 Mar 2015 Atmosphere Initiative
ICIMOD strengthens collaboration with national science academy

A Memorandum of Understanding (MoU) was signed between Nepal Academy of Science and Technology (NAST) and the International Centre for Integrated Mountain ...