Back to news
25 May 2016 | News

Developing Nepal’s Hydropower Potential

2 mins Read

70% Complete

Significant contributions in drafting and presenting ‘Hydropower Environmental Impact Assessment Guidelines (HP-EIA) of Nepal’ to the Government of Nepal (GoN) and stakeholders on 20 May, 2016 were made by the International Centre for Integrated Mountain Development’s (ICIMOD) Koshi Basin Initiative and International Finance Corporation (IFC). By helping developers manage environmental and social risks and impacts, and guard against unforeseen risks and impacts that could interrupt project execution, legal claims and any critical issues, the guidelines are key to any hydropower development.

In 2014, ICIMOD undertook the study ‘Basin-wide Strategic Environmental Assessment to Support Sustainable Hydropower Development’ which was based on the analysis of strategic level Policy Plan and Programme documents related to hydropower development and interviews with stakeholders. As a result, ICIMOD and IFC were requested by the Ministry of Population and Environment (MOPE), Nepal to collaborate with relevant ministries of Nepal in preparing the guidelines.

Inaugurating the consultation meeting, Bishwa Nath Oli, secretary of MOPE said that GoN has large aspiration to develop hydropower in a short time span and these guidelines form an integral part of developing hydropower. Mr Oli praised the support provided by IFC and ICIMOD to ensure sustainability of hydropower development in Nepal. Deputy Director General of the Department of Electricity Development, Nabin Raj Singh, thanked MOPE for their efforts and hoped it will continue to support to maximise local development benefits, and greater acceptance of projects by local communities and governments.

In her opening remarks, Ainsley Hemming, Second Secretary, Development Cooperation of the Australian Embassy, expressed her government’s commitment to support sustainable hydropower development in Nepal and congratulated the GoN for considering social and environmental impact assessment an integral part of the hydropower development process.

Eklabya Sharma, Director of Programme Operations from ICIMOD, said the new HP-EIA guidelines were prepared through a participatory process ensuring environmental impact assessments can be conducted quickly and efficiently, and are aligned with international performance standards, helping in expediting the government approval process. He gave his assurance ICIMOD will continue to provide support to GoN in updating and reforming environmental monitoring and regulatory framework and building government agency capacity to enhance their environmental oversight capabilities and attract investment opportunities.

The draft HP-EIA has been developed based on extensive gap analysis of existing Nepali EIA guidance documents and relevant legislation and comprehensive stakeholder consultations with local government, developers and EIA practitioners. These gaps included inadequate engagement of stakeholders; inadequately defined areas of influence and study areas, insufficient identification of baseline studies required to carry out EIA; not enough socio-economic and socio-community baseline studies; lack of knowledge on identifying and quantifying impacts; lack of precision on impact predictions, and inadequate alternatives analysis.

The HP-EIA provides guideline for each priority area in a simple checklist-based format in a clear and concise structure. This format aims to ensure guidelines are user-friendly and readily adopted by EIA practitioners, regulators, and hydropower developers in Nepal. Ideally, these new guidelines will improve financial and operational performance by optimising the management inputs such as water and energy, minimise negative impacts on ecosystem and maximise development benefits leading to a more efficient and cost-effective development and operation of hydropower projects.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related content

Continue exploring this topic

31 Jan 2016 News
HKH Permafrost Distribution Maps Assessment

[caption id="attachment_8734" align="alignnone" width="211"] The cover image of the ‘Manual for Mapping Rock ...

22 Jan 2016 News
Partnering for Better Livelihoods in Upper Indus

‘Agricultural Water, Energy and Hazard Management in the Upper Indus Basin for Improved Livelihood’, a special project in Upper Hunza, ...

Bucking the trend: Glaciers in Astore Basin have remained stable in recent times

Ground-based research results showed much lesser mass loss compared with that detected through remote sensing, with remarkably low uncertainty. The ...

13 Jul 2015 Atmosphere Initiative
ICIMOD supports helicopter relief and rescue missions

Within hours after the earthquake struck Nepal on 25 April 2015, help from overseas started arriving at Kathmandu airport. Soon ...

10 Jan 2020 SANDEE
Changing the way we think about and act on waste

The conference was organized to identify issues, bottlenecks, and areas requiring immediate attention in solid waste management and to explore ...

8 Jun 2017 Himalica
National Adaptation Plan (NAP) Reports Launched on World Environment Day in Kathmandu, Nepal

The reports launched also available for downloading at http://napnepal.gov.np/publication are: Synthesis of the Stocktaking Report for the NAP Process Vulnerability ...

5 Aug 2016 News
SERVIR Workshop Helps Finalise M&E Framework

  A regional workshop on ‘SERVIR Hindu Kush Himalaya (HKH) impact pathway, partnership and communication strategy’ was held 11-15 July 2016 ...

Brick sector partnership enhances state of knowledge on science, technology, and policy in Nepal and South Asia

The project conducted interactive trainings and workshops, solicited feedback from the FNBI’s member associations for increased ownership, and mobilized local ...