This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
0 mins Read
In its commitment to reduce its institutional carbon foot print and promote renewable energy, ICIMOD signed a contract with Sipradi Energy of Kathmandu to expand the use of solar electrification in its buildings and office campus.
The total feasible photovoltaic (PV) power installation at the ICIMOD complex is 152.75 kWp, of which 92 kWp will be installed in first phase. The remaining solar cells will be installed once construction of the new annex building is complete, making ICIMOD fully powered by the sun.
Installation is expected to be completed in early 2016.
Share
Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.
Related Contents
Kailash Sacred Landscape (KSL), HI-AWARE and Water Land and Ecosystem (WLE) initiatives of ICIMOD jointly with Advanced Center for Water Resouces ...
Large cardamom is a high-value export commodity contributing to enhanced income of farmers in Taplejung. However, overdependence of farmers on ...
Different stakeholders working in forest and biodiversity in Nepal met at the International Centre for Integrated Mountain Development (ICIMOD) on ...
Even as communities reel from the shock of the COVID-19 pandemic, the threat of floods is omnipresent. Koshi River drains ...
The Himalaya region is among the most vulnerable parts of the world to climate change. Retreating glaciers reduce dry-season water ...
During the workshop, Kinlay Tshering, Director of the Department of Agriculture, Bhutan, emphasized the need to capitalize on the unmet ...
The study was conducted with a joint team from the Forest Department (FD) under the Ministry of Natural Resources and ...
Nirakar Thapa, a hydrologist at DHM and Niraj Shankar Pradhananga, an assistant meteorologist at the department, processed and analyzed field ...