This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
0 mins Read
In its commitment to reduce its institutional carbon foot print and promote renewable energy, ICIMOD signed a contract with Sipradi Energy of Kathmandu to expand the use of solar electrification in its buildings and office campus.
The total feasible photovoltaic (PV) power installation at the ICIMOD complex is 152.75 kWp, of which 92 kWp will be installed in first phase. The remaining solar cells will be installed once construction of the new annex building is complete, making ICIMOD fully powered by the sun.
Installation is expected to be completed in early 2016.
Share
Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.
Related Contents
The purpose of the training was to increase gender transformative impacts in the HKH ...
The workshop ‘Participatory 3 Dimensional Model (P3DM) building’ was held 12-18 June 2016 at Dhungetar, Charghare VDC, Nuwakot in Nepal. ...
Participation of the private sector has opened up avenues for joint collaboration with local authorities for sustainable WUMP schemes and ...
Thirteen participants from Nepal attended a one day training on differential GPS training organised by the Cryosphere Initiative of the ...
Aspects related to climate change and other drivers of change in the Salween and Mekong basins and in the Tibetan ...
Every year, monsoon precipitation results in floods of various magnitudes inundating large areas of the Ganges, Brahmaputra, and Indus basins ...
A solar pumping system to irrigate the newly developed orchards along the Hunza River using drip irrigation in Upper Gojal, ...
The destruction of brick kilns caused by the massive earthquake earlier this April damaged approximately 110 chimneys in the valley. ...