This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
0 mins Read
In its commitment to reduce its institutional carbon foot print and promote renewable energy, ICIMOD signed a contract with Sipradi Energy of Kathmandu to expand the use of solar electrification in its buildings and office campus.
The total feasible photovoltaic (PV) power installation at the ICIMOD complex is 152.75 kWp, of which 92 kWp will be installed in first phase. The remaining solar cells will be installed once construction of the new annex building is complete, making ICIMOD fully powered by the sun.
Installation is expected to be completed in early 2016.
Share
Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.
Related Contents
A national consultation workshop on a social Code of Conduct (CoC) for Nepal’s brick sector was held in Kathmandu on ...
Li’s work focused on the derivation of high-resolution 3D glacier motion to understand the interaction between a glacial lake and ...
Women’s Day brings into focus women situated at various intersections of class, age, caste, race, education, culture, and geographical location. ...
One of the main challenges for countries prone to disaster events, such as Nepal, ...
The air in Kathmandu is extremely polluted, with fine particles (PM2.5) being the major cause of concern. If you ask ...
The G B Pant National Institute of Himalayan Environment & Sustainable Development, (GBPNIHESD), the Indian nodal organisation with support from ...
With support from the Kangchenjunga Landscape Conservation and Development Initiative (KLCDI) at the International Centre for Integrated Mountain Development (ICIMOD), ...
The 7.8 magnitude Nepal earthquake on April 25, 2015 and subsequent aftershocks caused more than 8,500 fatalities, nearly 22,500 injured, ...