This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
0 mins Read
In its commitment to reduce its institutional carbon foot print and promote renewable energy, ICIMOD signed a contract with Sipradi Energy of Kathmandu to expand the use of solar electrification in its buildings and office campus.
The total feasible photovoltaic (PV) power installation at the ICIMOD complex is 152.75 kWp, of which 92 kWp will be installed in first phase. The remaining solar cells will be installed once construction of the new annex building is complete, making ICIMOD fully powered by the sun.
Installation is expected to be completed in early 2016.
Share
Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.
Related Contents
ICIMOD’s Director Programme Operations Dr Eklabya Sharma and Livelihoods Theme Leader Dr Golam Rasul have been named members of the Silk Road ...
Agriculture and livestock keeping are the main sources of livelihoods for all 528 families (100 in Jajurauli and 428 in ...
Doctors now find themselves on the front lines of two increasingly connected issues: protecting ...
The International Centre for Integrated Mountain Development (ICIMOD) organized a filed excursion for 15 Bhutanese representatives to spring revival sites ...
Vote for ICIMOD's entry for Best Climate Practices Award ICIMOD and CEAPRED’s Climate Smart Villages, a pilot across four villages in Kavrepalanchowk in ...
Kailash Sacred Landscape (KSL), HI-AWARE and Water Land and Ecosystem (WLE) initiatives of ICIMOD jointly with Advanced Center for Water Resouces ...
The reports launched also available for downloading at http://napnepal.gov.np/publication are: Synthesis of the Stocktaking Report for the NAP Process Vulnerability ...
Socio-economic data collection through household surveys need huge investment in time, human resource, and cost. When one of these is ...