Back to news
19 Jun 2015 | Air pollution solutions

CCAC to support brick study in Nepal

2 mins Read

70% Complete

The 7.8 magnitude earthquake that hit Central Nepal on 25 April 2015 and the more than 300 aftershocks that followed, including one of 7.3 magnitude on 12 May, had a devastating impact. Around 9,000 people in Nepal, India, China, and Bangladesh lost their lives and even more were injured. It has been estimated that 2.8 million people have been displaced by the earthquake and Nepal has incurred economic losses amounting to USD 10 billion.

Damage to infrastructure has also been severe with about 491,620 buildings fully damaged, 269,653 buildings partially destroyed, and 7,532 schools and 1,100 health facilities damaged   (ICIMOD Infographics- ‘Nepal Earthquake 2015’). Given the extent of the damage caused by the earthquake, it is clear that Nepal has a lot to repair and rebuild. Never before has the demand for bricks and other building materials reached such a high level. However, the existing brick kilns have been severely damaged. This combination of extreme circumstances raises a big question: How will the country meet the demand for bricks and other building materials and what are the opportunities to improve brick kilns in Nepal.

At the High Level Assembly organized by the Climate and Clean Air Coalition (CCAC) in May 2015, ICIMOD’s Senior Air Quality Specialist, Dr Prakash Bhave, talked about the aftermath of the Nepal Earthquake 2015 and informed that all approximately 110 kiln chimneys in the Kathmandu Valley have been broken. On top of this, kilns are also facing labour shortages. Workers at the brick kilns, who come mostly from outside Kathmandu, have left the valley due to the fear of subsequent earthquakes. Even before the earthquake, the Federation of Nepal Brick Industries Association said that brick production had dropped by 40%, due partly to erratic rainfall.
From an environmental perspective, there is concern that the number of kilns in Kathmandu may increase to meet the rising demand for bricks for reconstruction. This colossal demand and resultant rise in the price of bricks might even lead kiln owners to overlook environmental standards in kiln design, like the height of the chimney. The safety of workers may also be compromised in the rush to produce bricks, as some of the affected kilns are operating with broken chimneys.
On a positive note, the construction of new kilns and repair of damaged ones can be viewed as an opportunity to encourage kilns owners to take up new environmentally sound technologies. In addition, the scarcity of bricks has raised public interest in alternative construction materials. With these problems and opportunities in mind, the Climate and Clean Air Coalition, in a press statement released during the High Level Assembly, announced that it will fund work on a feasibility study to rebuild the damaged brick industry in Nepal to increase kiln efficiency and reduce black carbon pollution. The study will also look at alternative building materials and earthquake safe construction practices.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Contents

Continue exploring this topic

13 Aug 2018 News
ICIMOD’s Eklabya Sharma delivers Sikkim University Foundation Day Lecture

By sharing relevant data from the HKH on increasing temperature trends, glacier area loss, and changing precipitation patterns, Sharma explained ...

Strengthening Farmers’ Knowledge on “Animal Nutrition and Health Care for Improving Dairy Production” in the Kangchenjunga Landscape, India

From 16-18 November 2017, around 50 dairy farmers from Ribdi-Gorkhey, India, convened in Ribdi for a three-day hands-on training and ...

22 May 2015 News
Team Kathmandu inspires

‘Tracking and Sensing through Android Robotics’ from Kathmandu’s 2015 NASA SpaceApps Challenge was named the 'Most Inspirational' in Global Competition ...

26 Dec 2016 News
Poster Presentation at the AGU

[caption id="attachment_7734" align="aligncenter" width="560"] Gunjan Silwal all set for her poster presentation.[/caption] Gunjan Silwal, ...

Technical Consultative Meeting on KLCDI Regional Programme Implementation Plan (2016–2020)

Internal Server Error The server encountered an internal error or misconfiguration and was unable to complete your request. Please contact the server ...

10 Jun 2015 News
Mobile application for reporting disaster events

ICIMOD and Kathmandu University, Nepal, launched ‘Disaster Reporting’, an android application that enables users to report disaster events along with ...

6 Jul 2015 News
Convergence in the understanding of water challenges crucial, say experts

The special session on ‘Water and Mountains’ convened by the International Centre for Integrated Mountain Development (ICIMOD) and theHimalayan Adaptation, ...

22 Sep 2015 News
Nepal’s Digital Agriculture Atlas Launched

The Digital Agriculture Atlas of Nepal takes data closer to decision makers by providing a one-stop shop for information related ...