Back to news
14 Dec 2015 | News

Expanding Efforts to Revive Koshi’s Drying Springs and Ponds

2 mins Read

70% Complete

 

Local community leaders from village development committees (VDCs) gathered  2 Decem-ber 2015 in Bhakunde Besi, Kavre for a one day workshop on upscaling the findings of par-ticipatory action research on springs and ponds. The action research was jointly carried out by Nepal Water Conservation Foundation (NWCF) and the International Centre for Integrat-ed Mountain Development (ICIMOD) by mobilising the local communities of Darauni Pokhari and Panchkhal. For the last two years, the research focused on understanding the relation-ship between rainfall, ground water recharge and spring water availability and its implica-tion to rural livelihoods.

The workshop’s objective was to share preliminary findings and to pave a path forward to broadcast findings to the adjoining VDCs of Darauni Pokhari — Chhatre Banj, Purano Gaun and Shyam Patti. Over sixty participants representing municipalities, district development committees (DDCs), VDCs, Nagrik Manch, local leaders, pond conservation committees, women’s groups and local people contributed to the workshop.

Locals from Darauni Pokhari reported the period of drinking water shortage was reduced significantly after the construction of a recharge pond. With the availability of a water tap nearby, the time for fetching water for domestic use was reduced significantly leaving more time for women to care for their children, to work in their homes, or to pursue other income generating activities. There was also an increase in water availability for livestock.

One health benefit that was noticed was in women. There had been an increase in cases of uterus prolapse problems due to women carrying 40 litres of water jar. A reduction in the distance to drinking water sources reduced the problem significantly.

Each ward plans at least one pond per ward in upcoming ward-level planning with at least 30 percent of their budgets dedicated to water conservation projects. It was recommended that the DDC should prepare an inventory of all public ponds and springs.

Local awareness on drying springs and conservation needs is high. Local FM has played a key role in awareness building. The technology in this action research is simple and easily understandable to local people and easily replicable.

Challenges remain in upscaling. With a high demand for pond construction, neither ICIMOD nor NWCF can reach every area. It was agreed the government should take responsibility to replicate the outcomes in neighbouring areas. NWCF and ICIMOD are only able to provide technical know-how and direction for the initial period of out-scaling.

There is a high demand of polyethylene (PVC) pipe and sheeting from the DDC office in Ka-vre. PVC pipes are mostly being used to divert water from springs to individual households and PVC sheeting is used to make individual plastic ponds that are not recharge friendly. It was recommended that the DDC cut such expenditures and use it instead for public pond construction and conservation activities which are sustainable.

Public structures such as a school, a football field and private houses were built on land that were prime sites for public ponds because the importance of ponds was not realised in the past. The acquisition of public land remains a challenge to expanding ponds.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Contents

Continue exploring this topic

31 Jul 2015 News
Hope for Kyaung Taung’s water woes

The village of Kyaung Taung in the Inle Lake area in Myanmar sits atop a hill overlooking Heho city. And ...

8 Oct 2015 News
Putting Disaster Risk Management in the Hindu Kush Himalayas within the Sendai Framework

Introduction The spate of deadly disasters in the past 10 years stands testimony to the region’s vulnerability, especially that of isolated ...

13 Sep 2019 Cryosphere
Towards data-driven hydropower development in Nepal

Countries in the Hindu Kush Himalayan region have been endowed with immense hydropower generation potential, but the changing climate and ...

10 Jun 2016 KSL
Mapping Kailash Kora for Conservation and Promotion of Responsible Heritage Tourism

Researchers from Sichuan University, China visited the International Centre for Integrated Mountain Development (ICIMOD) in Nepal 18-22 April 2016 to ...

29 Feb 2016 Atmosphere Initiative
Winter Study on Outdoor/Indoor Air Quality Measurements in Chitwan

A study of particulate matter (PM10) in ambient conditions was initiated in January 2016 by the Atmosphere Initiative of the ...

29 Sep 2015 News
Member countries develop methodology for land degradation Assessment

  Land degradation is common across the Hindu Kush Himalayan region, but surrounding countries lack proper documentation and modelling to properly ...

15 May 2015 News
Impact of Nepal Earthquake 2015 on Langthang Valley

  The 7.8 magnitude Nepal earthquake on April 25, 2015 and subsequent aftershocks caused more than 8,500 fatalities, nearly 22,500 injured, ...

14 Dec 2016 News
Bangladesh-ICIMOD Partnership Day

On Sunday, 4 December 2016, the International Centre for Integrated Mountain Development (ICIMOD) and The Ministry of Chittagong Hill Tracts ...