Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

Building air quality monitoring skills within the HKH to ensure reliable data generation

ICIMOD’s Atmosphere Initiative together with government counterparts (the Department of Environment in Nepal and the National Environment Commission in Bhutan) ...

14 Dec 2015 News
REDD+ updates

  ICIMOD’s REDD+ Initiative organized a Regional Learning Workshop on ‘Demystifying REDD+ Safeguards for South Asia’ from 2–6 November 2015 in Kolkata, India. ...

13 Nov 2018 CryoHub
ICIMOD’s partners in Nepal hail successful cryosphere research collaboration

In collaboration with the Department of Hydrology and Meteorology (DHM), the Water and Energy Commission Secretariat (WECS), Tribhuvan University (TU), ...

9 Jan 2017 News
KSLCDI Products Receive Special Mention at International Trade Fair

Kailash Sacred Landscape Conservation and Development Initiative (KSLCDI) participated in the Fifth International Herbal Trade Fair held in Bhopal, India, ...

30 Jul 2015 News
Using tablets for real-time data collection

Socio-economic data collection through household surveys need huge investment in time, human resource, and cost. When one of these is ...

10 Sep 2018 HI-RISK
Trails of Disaster: Experiences from a Trip to Barhabise

At the end of June 2018, I participated in a field visit 40–70 km east of Kathmandu, to the tributaries ...

25 May 2017 Himalica
High-level Bangladeshi Delegates visit Dabur Nepal’s Ashok Medicinal and Aromatic Plants Centre in Banepa

The Chittagong Hill Tracts of Bangladesh hold great promise for the production and commercialization of non-timber forest products such as ...