Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

12 Oct 2015 HKPL
Highland festival brings Pakistan and China region together

Along the border of China and Pakistan, some fifteen thousand feet above sea level at Khunjerab pass, more than 5,000 ...

2 Jan 2015 News
Promoting regional efforts to reduce flood vulnerabilities

ICIMOD, in collaboration with the World Meteorological Organization (WMO), organized the eighth Regional Steering Committee (RSC) meeting ...

15 Jun 2016 News
HKH Partnership to Foster Regional Solidarity

The Hindu Kush Himalayan (HKH) Partnership for Sustainable Mountain Development was launched during a ministerial-level panel discussion organized on 24 ...

30 Aug 2017 News
Bangladesh Agricultural Research Council and Partners to Collaborate on Strengthening Climate Services for Drought Monitoring

The workshop brought together key partners to discuss anticipated methods, work plans, and the user engagement process for the effective ...

6 Apr 2022 News
ICIMOD and Nepal Mountaineering Association embark on a partnership for mountains

Kathmandu, 5 April: A memorandum of understanding was signed between the International Centre for Integrated Mountain Development and Nepal Mountaineering ...

Professional Exchange Programme

Dema Yangzom, an engineer from the Department of Hydro-Met Services (DHMS) in ...

11 Oct 2015 News
Translating Koshi Basin Programme research into actionable policies

  Discussions on the preliminary findings of a recent socio-economic survey conducted on 1,600 households in 11 districts around the Koshi ...

17 Apr 2015 News
A new collaboration to manage forests

The International Centre for Integrated Mountain Development (ICIMOD) will be collaborating with the World Resources Institute (WRI) through its Global Forest Watch (GFW) initiative ...