Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

24 Feb 2020 News
First UIBN – Pakistan Chapter meeting and gender resource group consultation meeting convened

The first Upper Indus Basin Network – Pakistan Chapter (UIBN–PC) meeting was held in Islamabad, Pakistan, on 30–31 January ...

27 Jan 2016 KSL
A Need to Protect Nepal’s Diverse Resources

Nepal harbours abundant biodiversity. Diversity exists largely due to the unique climatic conditions and geography in the Himalayan range. Indigenous ...

12 Feb 2015 News
Women from Jumla learn to make bio-briquettes and cultivate herbs

During the training, the women learned the techniques for propagating Lott Salla (Taxus wallichiana) and Chirayita (Swertia chirayita) and for ...

Opinion: The Hindu Kush Himalayas need institutions for better cooperation

Himalayan countries can look to the Arctic Council, Alpine Convention and the Carpathian Convention to build multilateral cooperation mechanisms, advises ...

3 Jun 2016 Water
Kailash Sacred Landscape Initiative Addresses Water Worries Across the Region

‘We prefer to wait for water at the springs over attending meetings’, said a woman of Digtoli village, around 41 ...

How a cross-border exchange helped revive a traditional craft

Himalayan nettle is aptly named. The tough plant grows abundantly in most Himalayan forests above 1,500 masl. A hardy fibre ...

30 Jul 2015 News
ICIMOD’s REDD+ Himalaya initiative kicks off in Nepal

The REDD+ Himalaya Initiative of ICIMOD was formally launched during an inception meeting on ‘REDD+ Himalayas: Developing and using experience ...

6 Feb 2015 Cryosphere
Master Programme Thesis

Florencia Matina Tuladhar completed her thesis on “Determination of factors influencing recession ...