Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

29 Jul 2015 News
A practical lesson for Bhutanese farmers

As part of support for Rural Livelihoods and Climate Change Adaptation Programme (Himalica), a hands-on training on sustainable land management ...

13 Feb 2017 Himalica
Adopting Climate Resilient Practices on Cardamom Farms in Himalica Pilot Villages in Taplejung, Nepal

The International Centre for Integrated Mountain Development (ICIMOD) and the Environment Conservation and Development Forum (ECDF) organized a training for ...

24 Aug 2017 News
Participants of On-the-job Training Develop Glacier Change Data for Selected HKH Basins

The outcome of their work was reported to their supervisors at ICIMOD on a weekly basis, where assigned experts provided ...

8 Jul 2016 News
HIMAP Author Writeshop Held

The Hindu Kush Himalaya Monitoring and Assessment Program’s (HIMAP) Coordinating Lead Authors' Writeshop was organised by the International Centre for ...

8 Mar 2019 Gender in Koshi
Balance for better: Community enterprise for strengthening women entrepreneurship in Nepal

Business has largely been dominated by men across the world, and Nepal is no exception. Women usually need to be ...

30 Dec 2015 Himalica
Developing Community-led Micro-plans for Improving Livelihoods and Climate Change Adaptation

As a strategy for ensuring the sustainability of Himalica pilot interventions on livelihood improvement and climate change adaptation, Himalica supported ...

30 May 2017 News
Soil Erosion a Serious Concern in the Koshi Basin

Published in 2016, the study showed that the soil loss rate estimated was 22 million tonnes per hectare of barren ...

31 Jul 2015 News
Hope for Kyaung Taung’s water woes

The village of Kyaung Taung in the Inle Lake area in Myanmar sits atop a hill overlooking Heho city. And ...