Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

5 Mar 2018 REDD+
Melanesian Delegates Visit Nepal to Learn About REDD+ and Community Based Forest Management

Interactive sessions and presentations were conducted at ICIMOD and the REDD Implementation Centre (RIC). Face-to-face interactions with RIC government officials ...

13 Dec 2016 News
Mountain Festival Held in Pokhara to Mark International Mountain Day

ICIMOD and others marked International Mountain Day 2016 in Pokhara at the third annual Mountain Festival. The Nepal Mountaineering Association ...

Trash on Everest. This #WorldEnvironmentDay, it’s time to clean up our act

Read in Chinese   Three actions to #BeatPlasticPollution this World Environment Day Nowhere, it seems, is ...

9 Sep 2016 HICAP
HICAP China Synthesis Writeshop

Aspects related to climate change and other drivers of change in the Salween and Mekong basins and in the Tibetan ...

1 Jul 2016 Himalica
Myanmar Villagers Learn to Make Bio-briquettes

To address rural energy problems, twenty seven villagers from Kyang Taung, Kyang Nur, Pantin, Thyetpin, Antpet and Zeyar, Myanmar were ...

8 May 2015 News
ICIMOD’s earthquake response task force maps potential helicopter landing sites

A team of GIS and remote sensing experts at ICIMOD are mapping possible helicopter landing sites for village development committees ...

20 Jun 2017 Himalica
Himalica Contributes to the Local 12th Five-Year Plan for Tsirang, Bhutan

BOX 1: Climate-resilient technologies and good practices identfied from the Himalica Pilot site in Barshong for local 12th ...

13 Nov 2018 CryoHub
ICIMOD’s partners in Nepal hail successful cryosphere research collaboration

In collaboration with the Department of Hydrology and Meteorology (DHM), the Water and Energy Commission Secretariat (WECS), Tribhuvan University (TU), ...