Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

2 Jan 2015 News
Asia-Pacific Youth Forum and Training Workshop on Mountain Adaptation

Participants included high-level bureaucrats, youth leaders, researchers, and tech innovators from the region. They engaged in capacity building, ...

4 Apr 2018 Himalica
ICIMOD and SAPLING Project of HKI Collaborate to Promote Beekeeping in Ruma upazila, Bandarban

Encouraged by this result, the Himalica initiative sought collaboration with the Sustainable Agriculture and Production Linked to Improved Nutrition Status, ...

9 Dec 2016 News
Communities Develop Demonstrable Agroforestry Systems with Poulownia Plantation in Sushare Gaun, Gorkha, Nepal

Agroforestry is practiced in both tropical and temperate regions where it produces food, fiber and biomass energy, contributes to food ...

18 Nov 2016 News
Lima Adaptation Knowledge Initiative (LAKI) Priority Setting Workshop on Adaptation Knowledge Gaps in the Hindu Kush Himalaya

Adaptation knowledge gaps have been identified, repeatedly, as a barrier to widespread and successful adaptation actions. The 

16 Nov 2015 News
ICIMOD Gender Sensitisation Training for Support Staff

Gender sensitivity training for support staff was held 14 October 2015 at the International Centre for Integrated Mountain Development (ICIMOD). ...

16 Sep 2015 HKPL
Collaboration important for Wakhan National Park

ICIMOD and Ministry of Agriculture, Irrigation and Livestock of Afghanistan (MAIL) jointly organised a one-day meeting 5 August 2015 to explore ...

24 Jun 2015 News
Nepal deploys information platform for recovery and reconstruction

The Ministry of Home Affairs (MoHA), Government of Nepal, in close collaboration with the International Center for Integrated Mountain Development (ICIMOD), and technical ...

Brick Entrepreneurs in Pakistan Learn to Construct and Operate Zig-zag Brick Kilns

The events created awareness and trained brick entrepreneurs and workers in operating zig-zag kilns and precise brick stacking practices, and ...