Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

29 Jul 2016 News
Myanmar Officials Trained on Financial Procedures for REDD+ Initiative Partners

A two day workshop on ‘Financial Procedure and Disbursement Mechanism’ was organised by ICIMOD’s Regional REDD+ Initiative, under the Transboundary ...

16 Nov 2015 News
ICIMOD Gender Sensitisation Training for Support Staff

Gender sensitivity training for support staff was held 14 October 2015 at the International Centre for Integrated Mountain Development (ICIMOD). ...

21 Jun 2016 News
ICIMOD Supports the Celebration of International Biodiversity Day in Afghanistan

ICIMOD, together with the Wildlife Conservation Society (WCS) and theUnited Nations Environment Programme (UNEP), celebrated the International Biodiversity Day in Kabul on ...

17 Nov 2015 News
Soil Study in Mustang

  Up to 18 thousand gross tonnes of carbon are stored in worldwide soils, almost double the amount stored in all ...

12 Apr 2016 News
ADAPTHIMAL Partners on the Job Training at ICIMOD

Partners Uttarakhand Gramya Vikas Samiti, Integrated Livelihood Support Project (UGVS-ILSP), India and High Value Agriculture Project in Hill ...

11 Jun 2015 News
National partners from India trained on participatory natural resources management planning

From 11–18 May 2015, a workshop was held in the Indian part of the Kailash Sacred Landscape (KSL) to facilitate ...

27 Aug 2016 News
Partnering in Pakistan

Integrating key national and regional issues into the the Fourth Medium Term Action Plan (MTAP-IV, 2018-22) was the objective for ...

A more efficient brick sector through collaboration and mitigation actions

At the second Policy and Advocacy Network Asia (PAN) meeting on 20 and 21 June 2019, ICIMOD provided government representatives ...