Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

25 May 2019 News
In conversation with a climate leader

Bhandari has been engaged in climate action and activism since 2013, working with youth groups and organizations. She has been ...

2 Sep 2016 News
Koshi Basin Research Highlighted in India’s Largest Selling Daily

Embankment in Koshi Basin has further increased flood damage. This new finding was based on a research by ICIMOD Koshi ...

22 Feb 2018 HI-LIFE
Regional Workshop on Planning Transboundary Technical Collaboration for Landscape Management

The goal of the workshop was to concretize regional technical collaboration to support the nomination of the Hkakaborazi Landscape nomination ...

Incubation centre established for R&D of the brick sector in Nepal

The incubation centre will strengthen FNBI’s Technical Resource Development Committee (TRDC), and enable R&D for the continuous refinement of brick ...

5 Jun 2015 News
World Environment Day 2015: ‘Sustainable consumption and production’

ICIMOD celebrated World Environment Day 2015 in collaboration with the Government of Gilgit Baltistan, the Pakistan Agricultural Research ...

31 Mar 2015 News
Partners Refine Strategy for Upper Indus Basin Initiative

The International Centre for Integrated Mountain Development (ICIMOD) organized the first Upper Indus Basin (UIB) Strategic Committee Meeting in Lahore ...

30 Mar 2018 REDD+
Governance study of Community-Based Forest Management Systems (CBFMS) completed in Myanmar

Dr Tek Maraseni from the University of Southern Queensland, along with Griffith University in Australia and the Institute for Global ...

12 Apr 2018 News
AGORA Workshop in Nepal (29 -30 March, 2018)

Introduction The International Centre for Integrated Mountain Development (ICIMOD), in collaboration with the Food and Agriculture Organization of the United ...