Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

23 Sep 2015 News
Kathmandu University MS Glaciology students present research proposals

Eight students from Kathmandu University were invited to ICIMOD 21 August 2015 to present their research proposals to a panel ...

11 Jun 2018 REDD+
India’s first State REDD+ Action Plan in the making

The International Centre for Integrated Mountain Development (ICIMOD) has tried to build capacity to reduce emissions from deforestation and forest ...

9 Sep 2016 HICAP
HICAP China Synthesis Writeshop

Aspects related to climate change and other drivers of change in the Salween and Mekong basins and in the Tibetan ...

26 Feb 2015 News
Partners review progress of Koshi Basin Programme at IGSNRR, Beijing, China

The workshop was jointly organized by IGSNRR and the International Centre for Integrated Mountain ...

17 Jul 2017 SANDEE
SANDEE Joins ICIMOD

SANDEE brings together researchers and practitioners from South Asian countries to address the region’s environmental development challenges. For 16 years, ...

14 Nov 2017 News
Collaboration Strengthens Climate Resiliency of Upper Gojal Gilgit Mountain Villages in The Upper Indus Basin

Carried out in coordination with partners including WWF-Pakistan and Agha Khan Agency for Habitat (AKAH), these efforts have strengthened service ...

28 Sep 2016 News
Upper Indus Basin (UIB) Network Moots in Islamabad

The Technical Working Group (WG) and Strategic Committee Meetings of Upper Indus Basin (UIB) Network met 5 ...

20 Jun 2018 HICAP
Government of Nepal allocates public investment to Shardu Khola as a priority national urban watershed

In 2018, the Department of Soil Conservation and Watershed Management (DSCWM) under Nepal’s Ministry of Forests and Environment listed Shardu ...