Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

5 May 2017 Himalica
Promoting the Yak and Sea Buckthorn Value Chains in Gilgit-Baltistan, Pakistan

ICIMOD and AKSRP organized a training to promote these value chains and build the capacities of community members from the ...

4 Apr 2018 News
ICIMOD Regional Board Member Ding Zhongli Elected Vice Chairperson of China National People’s Congress Standing Committee

Born in 1957, Ding is a Chinese geologist and an academician at the Chinese Academy of Sciences (CAS). He ...

25 Dec 2015 Himalica
P3DM in Myanmar

  A training on Participatory 3-Dimensional Model (P3DM) building was held in Letmaungwe, Kyaung Taung Village, Nyaung Shwe Township in Myanmar ...

4 Aug 2022 News
Strengthening capacity for disaster risk reduction and management in the hydropower sector

The Hydropower Transboundary Working Group (TWG) under the Koshi Disaster Risk Reduction Knowledge Hub (KDKH) focuses on assessing multi-hazard vulnerability ...

10 Jun 2020 Cryosphere
Ice-dammed lake in Hunza created by Shisper Glacier surge breached for the second time in 2020

Clearly reinforcing the critical importance of glacier monitoring, an ice-dammed lake formed by the surging of Shisper Glacier breached for ...

19 Feb 2015 News
HICAP’s Work on Gender Applauded at CRM Expert Working Group Meeting

The study focused on the multiple drivers of change impacting women in Nepal and ...

16 Nov 2018 Cryosphere
Glaciologists share their research findings from the three “poles”

On 29 October 2018, glaciologists from three poles of the globe came together to discuss their research and explore new ...