Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

27 Jul 2015 HKPL
National Technical Consultation Meeting in Pakistan

ICIMOD, in collaboration with thegovernment of Kyber Pakhtunkhawa, hosted a National Technical Consultation meeting — Karakoram-Pamir-Wakhan Transboundary Conservation and Development ...

17 Jul 2017 SANDEE
SANDEE Joins ICIMOD

SANDEE brings together researchers and practitioners from South Asian countries to address the region’s environmental development challenges. For 16 years, ...

18 Feb 2015 News
ICIMOD and Aaranyak monitor and improve the CBFEWS in Assam, India

The team assessed and modified the existing equipment at the installation sites in Dihiri ...

13 Jun 2017 Atmosphere Initiative
Creating New Data Sets for Emissions Inventory

In Nepal, many community forests are involved in the production of charcoal from forest materials generated from the annual cutting ...

26 May 2015 News
Scoping REDD+ site in Myanmar

Part I: Kabani, Bagan On 26 March 2015, Thursday, an ICIMOD team comprising REDD+ Initiative Coordinator Bhaskar Karky and Communications Specialist ...

8 Aug 2016 News
An Innovative Flood Mapping Information to Speed Up Disaster Response

ICIMOD Koshi Basin Programme (KBP) can now rapidly produce ‘flood inundation map’ to speed up response to flooding in the ...

15 Apr 2015 News
Observing the Kailash progress

A team of officials from the Department for International Development (DFID) under the United Kingdom government visited the districts of ...

28 Oct 2016 News
Upper Indus Basin (UIB) Network Strategic Committee Meeting

The International Centre for Integrated Mountain Development’s (ICIMOD) Strategic Committee Meeting of Upper Indus Basin (UIB) Network was held  17 ...