Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

6 Oct 2016 News
Pakistani Policy Makers Visit Upper Indus Basin Pilot Projects

A field visit to enhance understanding of ongoing International Centre for Integrated Mountain Development (ICIMOD) activities in Pakistan through exposure ...

19 Jan 2018 Water
Pakistan Government Credits CBFEWS for Zero Loss of Human and Animal Lives in Sherqilla Floods

On 3 August 2017, in the pre-dawn hours of 4:30 am, the community-based flood early warning systems (CBFEWS) at ...

23 Nov 2015 News
Multi-stakeholder Consultation Meeting for AdaptHimal Initiative in Khagrachari, Bangladesh

  The International Centre for Integrated Mountain Development (ICIMOD) organised a multi-stakeholder consultation meeting in collaboration with the Khagrachari Hill Development Council ...

3 May 2016 Himalica
Farmers Learn Modern Beekeeping

Beekeeping with Apis cerana is a common practice among the pilot households in Taplejung district of Nepal. Over one-third of the households ...

12 Feb 2015 News
ICIMOD participates in the SAARC Working Group on Monsoon Meeting

At the second SWGM meeting, which was jointly organized by SAARC Meteorological Research Centre (SMRC) and the India ...

20 Jun 2018 HICAP
Government of Nepal allocates public investment to Shardu Khola as a priority national urban watershed

In 2018, the Department of Soil Conservation and Watershed Management (DSCWM) under Nepal’s Ministry of Forests and Environment listed Shardu ...

25 Mar 2019 Geospatial solutions
Hand in hand for global biodiversity data sharing

The 2018 Global Biodiversity Information Facility (GBIF) Asia Regional Nodes Meeting was held in Kathmandu, Nepal, from 17 to 18 ...