Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

24 Feb 2016 News
Rewarding Conserving Dhankuta Upstream Communities

The International Centre for Integrated Mountain Development (ICIMOD) and Dhankuta municipality have combined to manage upstream water sources and possible ...

12 Jul 2016 Atmosphere Initiative
Understanding Black Carbon Impact on Glaciers

In April 2016 and team of glaciologists and experts from the International Centre for Integrated Mountain Development’s (ICIMOD) and partner ...

25 May 2015 News
Grave situation in Sindhuli as recovery begins

On 19 and 20 May, a team from ICIMOD visited four northern VDCs of Sindhuli District - Baseshwor, Bhimeshwor, Jalkanya, ...

9 Feb 2016 Wetlands
Water Flow and Koshi Ecosystems

A two-day consultative workshop was held 4 February in Kathmandu to understand the con-nection between water flow and ecology in ...

3 Jul 2017 Cryosphere
Building Capacity on Database Management in Bhutan

Namgyal was introduced to data, data types, data format, database structure, MODIS snow data, and database management. He also learned ...

7 Feb 2020 KSL
Including neglected voices in natural resource management planning

Women are primary users of natural resources; yet their voices are rarely sought when plans are prepared to manage natural ...

5 Mar 2018 REDD+
Melanesian Delegates Visit Nepal to Learn About REDD+ and Community Based Forest Management

Interactive sessions and presentations were conducted at ICIMOD and the REDD Implementation Centre (RIC). Face-to-face interactions with RIC government officials ...

3 Jun 2016 Water
Kailash Sacred Landscape Initiative Addresses Water Worries Across the Region

‘We prefer to wait for water at the springs over attending meetings’, said a woman of Digtoli village, around 41 ...