Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

29 Apr 2016 News
Glaciology Student Work Presented at ICIMOD

On 8 April 2016, four students in their final year of MS Research in Glaciology shared their thesis progress with ...

Lessons Learnt from Training on Mapping and Monitoring Glaciers using RS and GIS at ICIMOD

The participants came from the National Center for Hydrology and Meteorology (NCHM), Bhutan; Karakoram International University (KIU), Pakistan; the Department ...

DFID and ICIMOD Come Together for Cleaner Bricks in Nepal

Nepal’s Clean Brick Initiative has been consolidated by the signing of an accountable grant arrangement between the 

6 Feb 2015 Cryosphere
Master Programme Thesis

Florencia Matina Tuladhar completed her thesis on “Determination of factors influencing recession ...

24 Aug 2018 SANDEE
Nurturing Evidence-based Solutions for a Sustainable Future in South Asia

Twice a year, SANDEE requests research concept notes in any area of environmental and resource economics with implications for poverty ...

29 Sep 2015 News
Farmers adopting Technology

This article about Climate Smart Villages was first written by Madhusudhan Guragain in Nepali. It appeared in Nagarik Daily on ...

22 Mar 2017 HKPL
Xi’an delegation visits ICIMOD and other relevant departments in Nepal

An official delegation from Shaanxi Province, Xian, China visited ICIMOD from 19 - 23 February 2017, a visit organized by ...

17 Mar 2017 Himalica
Brand HIMALICA – Green Products from the Mountains soft-launched at the Sixth Nepal International Trade Fair

Nepali Prime Minister Pushpa Kamal Dahal inaugurated the Sixth Nepal International Trade Fair in Bhrikutimandap, Kathmandu, Nepal, on 16 March ...