Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

5 Aug 2016 News
SERVIR Workshop Helps Finalise M&E Framework

  A regional workshop on ‘SERVIR Hindu Kush Himalaya (HKH) impact pathway, partnership and communication strategy’ was held 11-15 July 2016 ...

‘Dhuwa’ Film Educates on Air Pollution

  ‘Dhuwa’, a short telefilm about air pollution resulting from open fires premiered on 1 October 2015 at Kumari Hall in ...

1 Jul 2016 Himalica
Myanmar Villagers Learn to Make Bio-briquettes

To address rural energy problems, twenty seven villagers from Kyang Taung, Kyang Nur, Pantin, Thyetpin, Antpet and Zeyar, Myanmar were ...

24 Sep 2015 News
Landslide early warning system for Chittagong Metropolitan area, Bangladesh

Every year, the rainy season in the Chittagong Metropolitan Area (CMA), Bangladesh brings news of human causalities and property damage ...

11 Dec 2015 News
UAV Research in Khumbu Valley

Against the unparalleled backdrop of Everest and Nuptse, the late November sun warms the glaciologist slightly as he prepares for ...

25 Feb 2015 News
Pilot project launched in Bangladesh

The pilot will be implemented in Bandarban District by the Bandarban ...

13 Aug 2018 News
ICIMOD’s Eklabya Sharma delivers Sikkim University Foundation Day Lecture

By sharing relevant data from the HKH on increasing temperature trends, glacier area loss, and changing precipitation patterns, Sharma explained ...

4 Jan 2018 News
At The Crossroads takes ICIMOD Prize at the Kathmandu International Mountain Film Festival

Through his subtle yet powerful depiction of the struggles of rural mountain village life in Uttarakhand, India, director Savyasachi Anju ...