Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

21 Sep 2018 REDD+
ICIMOD supports Myanmar in drafting REDD + Action Plan for Shan State

Myanmar has the largest remaining forest area in Southeast Asia, with 44% of its land classified as forest, but it ...

24 Oct 2018 HKPL
Bam-e-Dunya: a network to bolster conservation efforts on the roof of the world

This historic agreement lays the foundation for long-term collaboration and exchange to conserve fragile ecosystems and help mountain communities adapt ...

10 Nov 2022 News
ICIMOD Mountain Chairs discuss water, energy, and food security in the Eastern Himalayas

Dr Jyoti Prakash Tamang (ICIMOD Mountain Chair 2019–2021, Sikkim University, India) hosted Dr Christopher Scott (ICIMOD Mountain Chair 2020–2022, Penn ...

24 Apr 2019 Gender
ICIMOD Gender Lead participates in Secretariat of the Convention on Biological Diversity and UN-Women’s Expert Workshop in New York

Considering the importance of integrating cross-cutting issues such as gender in global biodiversity conservation and development, the International Centre for ...

28 Feb 2016 Himalica
Beekeeping Makes for Better Lives Nepal

Beekeeping is an income generating option in several areas across HKH region. A group of experts from the Initiative International ...

Pakistani Team Travels to China to Explore Possibilities for Strengthening Yak Value Chains in Pakistan

A team of yak value chain actors from Pakistan travelled to Lanzhou is Gansu province, China, in April 2017 to ...

18 Apr 2017 News
International Symposium on the Cryosphere in a Changing Climate

The two share their experiences from the event: Inka Koch, Glacier Hydrologist, ICIMOD It was an honour to present our research on ...

25 Sep 2017 Atmosphere Initiative
Signing of an agreement between ICIMOD and SIDA

As part of its mission to reduce poverty in the world through development cooperation, the Swedish International Development Cooperation Agency ...