Back to news
11 Jul 2016 | News

Landslide Dam Assessment in Chin State, Myanmar

2 mins Read

70% Complete

A team of scientists recently visited the landslide dam in Chin State, Myanmar to assess the risk associated with the dam and to develop a comprehensive management plan. Conditions of the lake, landslide dam features, dam materials, the river course and river bed materials were studied. The team observed the landslide dam is composed of loose and highly shattered shale with scattered sandstone boulders — materials easily eroded by rain water and highly permeable.

Experts Samjwal Bajracharya and Sudan Maharjan from the International Centre for Integrated Mountain Development (ICIMOD) and Vishnu Dangol from Tribhuvan University joined with the team from Chin State Forest Department. The group was invited by Dr Nyi Nyi Kyaw, ICIMOD Board member, Director General of Forest Department, Ministry of Environmental Conservation and Forestry and Dr Tint Swe, Director, Watershed Management Division, Forest Department Ministry of Natural Resources and Environmental Conservation.

Discussion with DG of Forest Department
Photo: Sudan Bikash Maharjan/ICIMOD

At present, the lowest freeboard, the height above the recorded high-water mark of the dam, is only 9 m and is expected to decrease rapidly during the monsoon season. Erosion and compaction will result in further reduction of the freeboard. The meteorological department forecasts at least one storm will occur in each month of this monsoon period and there is a strong probability of the dam breaching in this monsoon.

Most physical information was generated through remote sensing or collected in the field analysed through geographic information system (GIS). Combining and analysing remote sensing data and the field investigation, the ICIMOD team sees a strong possibility of dam breach during the monsoon. If the Chin Hill landslide dam breaks and causes a flash flood, additional land-slides may occur within 10 km downstream and debris deposits may continue further down-stream. Fortunately, no settlements or infrastructure exist along the river down until Yazagyo dam and reservoir, 52 km from the landslide dam. Damage should be minimal, however, the possibility of additional sedimentation is high.

The team recommended the installation of an automatic weather station (AWS) and an  automatic water level station (AWLS) with real-time satellite connection to monitor the precipitation and lake water level. Immediate installation of a flood warning system was recommended to keep people away from the river valley bottom down to the Yazagyo reservoir. Monitoring of lake water levels and dam conditions using web camera with an image feed is also needed to reduce risk. The team made a presentation to officials of Myanmar and briefed them on the their findings and recommendations.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Content

Continue exploring this topic

30 Nov 2018 Cryosphere
Knowledge sharing on the 3D motion of glaciers in China’s Central Tien Shan region

Li’s work focused on the derivation of high-resolution 3D glacier motion to understand the interaction between a glacial lake and ...

3 Apr 2018 CBFEWS
Gilgit-Baltistan partnership in disaster risk management: key effort in enabling mountain people understand and respond to consequences of climate change

ICIMOD, AKAH, and GB-DMA signed a tripartite agreement at a partnership-signing ceremony in Islamabad on 27 February 2018. The team ...

8 Mar 2018 Gender in Koshi
Women and Fieldwork: Reclaiming public spaces and transgressing curfews

Women’s Day brings into focus women situated at various intersections of class, age, caste, race, education, culture, and geographical location. ...

Taungya System Workshop in Chin, Myanmar

Taungya, or shifting cultivation system, is a major food and income production system for the majority of farmers in Chin ...

8 Mar 2017 Blog
Water Scarcity and Women’s Lives: an Observation from the Field

Recently, while on a research trip studying adaptive water governance under the Himalayan Adaption, Water and Resilience ...

5 Dec 2015 HICAP
Adopting Climate Smart Village Approach for Restoring Landscapes

Members of the Association of International Research and Development Centers for Agriculture (AIRCA) presented and discussed different aspects of climate-smart ...

16 Dec 2013 News
White paper launched on COP 19 sidelines

The International Centre for Integrated Mountain Development (ICIMOD) supported the launch of the Association of International Research ...

13 Dec 2017 News
Field excursion to Sikkim’s spring revival sites

The International Centre for Integrated Mountain Development (ICIMOD) organized a filed excursion for 15 Bhutanese representatives to spring revival sites ...