Back to news
10 Sep 2017 | News

Pakistani Officials Support Early Flood Warning System Implementation in Gilgit Baltistan

A hazard is an agent that harms or damages life, health, property, or the environment. It can be either natural or attributable to an anthropogenic activity that results in imbalances in ecological cycles and ecosystems as a whole. The rough terrain, steep slopes, loose soil, sparse vegetation, heavy rainfall, and snowfall that characterize the Upper Indus Basin (UIB) region of Gilgit Baltistan (GB) in Pakistan trigger several hazards.

1 min Read

70% Complete
Installation of DCP

To manage hazards in the region, World Wildlife Fund (WWF)-Pakistan and the International Centre for Integrated Mountain Development (ICIMOD), with technical assistance from the Aga Khan Agency for Habitat (AKAH) and the Gilgit Baltistan Disaster Management Authority (GBDMA), have installed two community based flood early warning systems (CBFEWSs) in the district of Ghizer. These systems have been installed in Dammas and Sherquilla, where they are used to provide early warning regarding debris floods and flash floods respectively.

A CBFEWS mainly consists of three main parts: sensor (water level sensor and radar sensor), data collection platform (DCP), and audio remote terminal unit (ARTU). These components are highly dependent on each other and work together like organs in the human body. It is essential that all components of CBFEWSs be within sight for proper coordination. Sensors are installed in nullahs (watercourse, riverbed, or ravine) from where flooding will occur. The sensors are set at certain threshold levels and send information to DCP. After processing data, DCP transmits signals to ARTU, which consists of loudspeakers to disseminate information transferred by the DCP, and rings the flood alarm.

2
3
1. Installation of ARTU in Dammas Valley 2. Installation of WRTU at Derani nala 3. Officials having discussion during the meeting.

Local stakeholders play an important part in determining the success of any project and getting fruitful results. In a meeting that followed the visit, the AC discussed the replication of early warning systems in other parts of the region so that local stakeholders might be able to get involved in ensuring the safety of vulnerable areas. As the installation of the system is challenging, it was decided that AKAH would train two technical professionals to be caretakers of the systems and safeguard the installations. The meeting wrapped up with a vote of thanks, acknowledging the officials and participants. Furthermore, WWF-Pakistan is planning to coordinate with the DC of Ghizer to improve the systems in place to ensure proper preparedness in the event of future natural disasters.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related content

Continue exploring this topic

17 May 2016 News
ICIMOD’s Contribution to Implementation of the Prime Minister’s Directive to Accelerate Socioeconomic Development in the Chittagong Hill Tracts is Recognised

The Ministry of Chittagong Hill Tracts Affairs (MOCHTA) considers ICIMOD’s strategic framework for sustainable development in the Chittagong Hill Tracts (CHT) of ...

River basin approach demands coordination among multidisciplinary agencies: interview with Prem Paudel, Chief of the Planning Section, DSCWM

Prem Paudel is Chief of the Planning Section, Department of Soil Conservation and Watershed Management, Ministry of ...

25 May 2015 News
ICIMOD provides relief to communities

  In the aftermath of the Great Earthquake of 25 April and in consultation with the Government of Nepal, ICIMOD provided immediate ...

29 Jun 2022 News
Joining hands for stronger disaster preparedness and response in Dolakha, Nepal

Discussions during a consultation meeting among Upper Koshi Basin stakeholders focused around understanding different types of hazards; exploring various measures ...

18 Nov 2016 News
Lima Adaptation Knowledge Initiative (LAKI) Priority Setting Workshop on Adaptation Knowledge Gaps in the Hindu Kush Himalaya

Adaptation knowledge gaps have been identified, repeatedly, as a barrier to widespread and successful adaptation actions. The 

6 Jul 2016 News
Partnership Brokering Training at ICIMOD

Practice-based learnings for effective partnership brokering develops robust, efficient and innovative partnerships. Offered as an open call ...

31 Jan 2016 News
HKH Permafrost Distribution Maps Assessment

[caption id="attachment_8734" align="alignnone" width="211"] The cover image of the ‘Manual for Mapping Rock ...

10 Jan 2020 SANDEE
Changing the way we think about and act on waste

The conference was organized to identify issues, bottlenecks, and areas requiring immediate attention in solid waste management and to explore ...