Back to news
25 Jul 2019 | Cryosphere

Sediment management for sustainable hydropower development in Nepal

2 mins Read

70% Complete
On a fact-finding mission: Participants identify gaps and discuss solutions for sedimentation and hydropower development in Nepal. (Photo: Jitendra Bajracharya/ICIMOD)

Hydropower generation is a viable base upon which economies could flourish in the Hindu Kush Himalayan (HKH) region, but excessive sediment loads in rivers and reservoir sedimentation pose a major challenge in operationalizing and maintaining sustainable hydropower plants. “There is no doubt that sedimentation has to be the main agenda for sustainable development in the hydropower sector,” concurs Sailesh Chitrakar, Senior Researcher at Kathmandu University’s Turbine Testing Lab. “Sedimentation impacts production and shuts down turbines, resulting in higher costs through frequent maintenance and repair costs”.

The HKH region is vulnerable to climatic changes, which directly affect erosion, sediment transport, and deposition processes at a basin scale. Long-term data are needed to understand sediment dynamics and design sustainable hydropower projects. As the sediment-monitoring data currently available are inadequate for informed decision making, sedimentation continues to hinder development of economically viable hydropower infrastructure.

To fully understand the extent of challenges posed by sedimentation and devise a way to address them, the Norwegian Water Resources and Energy Directorate (NVE) and ICIMOD organized a fact-finding workshop on 22 May 2019. The workshop – attended by representatives of key organizations involved in hydropower development and sedimentation in Nepal – mapped out the status and challenges of sedimentation.

Key issues identified during the workshop

As the lack of and access to reliable and quality data is the major issue, the first step towards understanding the extent of sedimentation is to develop and establish a standardized data collection protocol. Hydropower companies and other infrastructure development organizations could particularly benefit from such a standardized data collection guideline and improved access to quality data.

“Sediment data and catchment management plans help identify potential project sites. Quality data can contribute to a comprehensive river basin plan,” shares Sabina Kharbuja, Senior Divisional Engineer, Water and Energy Commission Secretariat (WECS), Government of Nepal. Santosh Nepal, Water and Climate Specialist, ICIMOD, similarly sees the need to conduct and act on the basis of rigorous research: “More holistic research on land use/land cover change, erosion, and sedimentation is required to better understand the causes and effects of erosion and sedimentation at a basin scale. Better data and scientific analysis can help make informed decisions for hydropower planning and development”. Extensive research on the cause and patterns of erosion and sedimentation, including during extreme events, is also needed for sustainable hydropower plant development.

On the policy front, the workshop highlighted the need to include progressive licensing conditions, which could encourage private hydropower developers to invest in long-term watershed management. The existing laws require hydropower developers to hand over ownership to the state after 30 years.

The NVE and ICIMOD are collaborating for the second phase of the Snow Accumulation and Melt Processes (SnowAMP) project, which aims to improve knowledge on sediment dynamics for sustainable hydropower development in Nepal. The SnowAMP project is implemented with financial support from the Royal Norwegian Embassy, Kathmandu. The project plans to address several other issues around hydropower development in Nepal.

Read more about the participating organizations of the fact-finding workshop:

Norwegian Water Resources and Energy Directorate
Water and Energy Commission Secretariat
Department of Hydrology and Meteorology
Kathmandu University
Tribhuvan University
Department of Forests and Soil Conservation
DK Consult Pvt. Ltd.
Independent Power Producers’ Association, Nepal (IPPAN)
Butwal Power Company Limited
Himal Power Limited
HYDRO LAB
Nepal Water & Energy Development Company Pvt. Ltd

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

RELATED CONTENTS

Continue exploring this topic

8 Mar 2019 Gender in Koshi
Balance for better: Community enterprise for strengthening women entrepreneurship in Nepal

Business has largely been dominated by men across the world, and Nepal is no exception. Women usually need to be ...

21 Jun 2018 Geospatial solutions
First comprehensive report on glacial lakes in the Hindu Kush Himalaya released

Experts refer to the different types of glacial lakes based on dam type and the process by which the lake ...

6 Feb 2015 News
Consultation on Promoting Sustainable Mountain Agriculture in Gilgit Baltistan

During the meeting, Izhar Hunzai, a consultant with ICIMOD, gave an overview of the proposal. Seerat Asghar, Federal Secretary at ...

25 Feb 2015 News
Pilot project launched in Bangladesh

The pilot will be implemented in Bandarban District by the Bandarban ...

Bucking the trend: Glaciers in Astore Basin have remained stable in recent times

Ground-based research results showed much lesser mass loss compared with that detected through remote sensing, with remarkably low uncertainty. The ...

15 May 2015 News
Impact of Nepal Earthquake 2015 on Langthang Valley

  The 7.8 magnitude Nepal earthquake on April 25, 2015 and subsequent aftershocks caused more than 8,500 fatalities, nearly 22,500 injured, ...

26 Dec 2016 News
Poster Presentation at the AGU

[caption id="attachment_7734" align="aligncenter" width="560"] Gunjan Silwal all set for her poster presentation.[/caption] Gunjan Silwal, ...