Back to news
25 Jul 2019 | Cryosphere

Sediment management for sustainable hydropower development in Nepal

2 mins Read

70% Complete
On a fact-finding mission: Participants identify gaps and discuss solutions for sedimentation and hydropower development in Nepal. (Photo: Jitendra Bajracharya/ICIMOD)

Hydropower generation is a viable base upon which economies could flourish in the Hindu Kush Himalayan (HKH) region, but excessive sediment loads in rivers and reservoir sedimentation pose a major challenge in operationalizing and maintaining sustainable hydropower plants. “There is no doubt that sedimentation has to be the main agenda for sustainable development in the hydropower sector,” concurs Sailesh Chitrakar, Senior Researcher at Kathmandu University’s Turbine Testing Lab. “Sedimentation impacts production and shuts down turbines, resulting in higher costs through frequent maintenance and repair costs”.

The HKH region is vulnerable to climatic changes, which directly affect erosion, sediment transport, and deposition processes at a basin scale. Long-term data are needed to understand sediment dynamics and design sustainable hydropower projects. As the sediment-monitoring data currently available are inadequate for informed decision making, sedimentation continues to hinder development of economically viable hydropower infrastructure.

To fully understand the extent of challenges posed by sedimentation and devise a way to address them, the Norwegian Water Resources and Energy Directorate (NVE) and ICIMOD organized a fact-finding workshop on 22 May 2019. The workshop – attended by representatives of key organizations involved in hydropower development and sedimentation in Nepal – mapped out the status and challenges of sedimentation.

Key issues identified during the workshop

As the lack of and access to reliable and quality data is the major issue, the first step towards understanding the extent of sedimentation is to develop and establish a standardized data collection protocol. Hydropower companies and other infrastructure development organizations could particularly benefit from such a standardized data collection guideline and improved access to quality data.

“Sediment data and catchment management plans help identify potential project sites. Quality data can contribute to a comprehensive river basin plan,” shares Sabina Kharbuja, Senior Divisional Engineer, Water and Energy Commission Secretariat (WECS), Government of Nepal. Santosh Nepal, Water and Climate Specialist, ICIMOD, similarly sees the need to conduct and act on the basis of rigorous research: “More holistic research on land use/land cover change, erosion, and sedimentation is required to better understand the causes and effects of erosion and sedimentation at a basin scale. Better data and scientific analysis can help make informed decisions for hydropower planning and development”. Extensive research on the cause and patterns of erosion and sedimentation, including during extreme events, is also needed for sustainable hydropower plant development.

On the policy front, the workshop highlighted the need to include progressive licensing conditions, which could encourage private hydropower developers to invest in long-term watershed management. The existing laws require hydropower developers to hand over ownership to the state after 30 years.

The NVE and ICIMOD are collaborating for the second phase of the Snow Accumulation and Melt Processes (SnowAMP) project, which aims to improve knowledge on sediment dynamics for sustainable hydropower development in Nepal. The SnowAMP project is implemented with financial support from the Royal Norwegian Embassy, Kathmandu. The project plans to address several other issues around hydropower development in Nepal.

Read more about the participating organizations of the fact-finding workshop:

Norwegian Water Resources and Energy Directorate
Water and Energy Commission Secretariat
Department of Hydrology and Meteorology
Kathmandu University
Tribhuvan University
Department of Forests and Soil Conservation
DK Consult Pvt. Ltd.
Independent Power Producers’ Association, Nepal (IPPAN)
Butwal Power Company Limited
Himal Power Limited
HYDRO LAB
Nepal Water & Energy Development Company Pvt. Ltd

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

RELATED CONTENTS

Continue exploring this topic

29 Jun 2017 Climate change
REDD+ Experts Meet at the Ministry of Climate Change in Pakistan

Broadly, the meeting paved the way forward for creating synergies and future lines of action in the context of REDD+ ...

24 May 2017 Himalica
Himalica Action Research – The Journey: From Disaster to Preparedness

Women from migrant-sending households are increasingly responsible for managing disaster risks as well as household resources. Raising their awareness, improving ...

8 Apr 2016 News
Teesta Basin Visit Reveals Spring Knowledge Gaps

HI-AWARE researchers from the International Centre for Integrated Mountain Development (ICIMOD), The Mountain Institute-India and local organisations recently visited Santook ...

22 May 2019 Livelihoods
Regional cooperation for tourism development: High-level dialogue on promoting India–Nepal cross-border tourism, trade, and industry

Cross-border tourism and regional cooperation are priority areas of the KLCDI – part of its overarching goal to further landscape-level ...

6 Apr 2016 News
World Water Day-2016 ‘Water and Jobs’

‘Water and Jobs – Empowering Young Professional’ was the theme for the 2016 World Water Day celebration program, highlighted the ...

4 May 2021 Cryosphere
Importance of glaciers for water availability in Pakistan

Snow and glacier meltwater from the Karakoram and western Himalaya provides water to 268 million people in the Indus basin ...

28 Sep 2016 News
Upper Indus Basin (UIB) Network Moots in Islamabad

The Technical Working Group (WG) and Strategic Committee Meetings of Upper Indus Basin (UIB) Network met 5 ...

20 Jun 2017 Himalica
Himalica Contributes to the Local 12th Five-Year Plan for Tsirang, Bhutan

BOX 1: Climate-resilient technologies and good practices identfied from the Himalica Pilot site in Barshong for local 12th ...