Back to news
23 Sep 2015 | News

Upper Indus Basin Network Meeting

2 mins Read

70% Complete

ICIMOD and its partner organisations of the Upper Indus Basin (UIB) Network — Pakistan Meteorological Department (PMD), Water and Power Development Authority (WAPDA), WWF-Gilgit Baltistan, FOCUS — came together for a meeting in Islamabad, Pakistan on 26 July 2015. The meeting was organised to report on progress made since November 2014 by the six technical working groups, and to discuss future network strategies. The UIB Network is a collaborative of organisations working in the region to improve present and future water availability, demand, and hazards, and to provide solutions for all with concerned with water usage.

Six thematic working group presented progress on: data collection; quality and sharing; climate variability and trends; cryosphere monitoring and modelling; hydrology; water availability and demand-basin scale; hazards and risks; adaptation strategies at the local-level water use; and management and socioeconomic factors.

During the general discussion, the group was updated on current partnership progress. ICIMOD and Future Water are working on improving the Spatial Processes in Hydrology (SPHY) model interface and plan to organise a second training in December 2015. Similarly, a joint study on migration and ecosystem based adaptation is being conducted by WWF and ICIMOD. Similarly, ICIMOD is conducting a joint study on migration, ecosystem based adaptation, and Payment Ecosystem Services (PES) with WWF. An irrigation, water conservation and hazard management study is being jointly conducted with the United Nations Development Programme (UNDP). FOCUS and ICIMOD will be installing early warning system to reduce the vulnerability of local communicates to glacial lake outburst floods (GLOF). As many ICIMOD partners are working in Gilgit Baltistan (GB), an inventory of the projects should be prepared and shared with policy makers that will help UIB Network to get new projects.

A separate strategic committee meeting was held concerning how to incorporate new members into the UIB Network and how to develop and share separate work plans from different institutions with the group. Other issues covered were the need for a data sharing policy, and the desire to approach relevant universities for wider dissemination of knowledge and sharing. A follow up workshop was agreed upon in late September during the Karakoram International University workshop in Gilgit.

In closing, the partners suggested that more institutions should be included in the UIB network. Separate meetings should be organized for each working group, detailed Terms of Reference (ToR) and action plan for each working group should be prepared. The members discussed that there should be uniformity in data collection, site selection, installation of equipment and identifying critical glaciers.

Stay current

Stay up to date on what’s happening around the HKH with our most recent publications and find out how you can help by subscribing to our mailing list.

Sign Up

Related Contents

Continue exploring this topic

28 Sep 2016 News
Discussing Strategy for SDIP Phase-II in Upper Indus Basin

The International Centre for Integrated Mountain Development (ICIMOD) organised a consultation meeting 4 August 2016 in Islamabad to develop logical ...

9 Dec 2016 News
Training to Measure Glaciers in Afghanistan, Bhutan, and Nepal

A four-day theoretical training on glacier mass balance monitoring was conducted from 25–28 October 2016 at the International Centre for ...

23 Dec 2015 News
A Sunny Future – ICIMOD All Solar

  In its commitment to reduce its institutional carbon foot print and promote renewable energy, ICIMOD signed a contract with Sipradi ...

25 Feb 2015 News
Pilot project launched in Bangladesh

The pilot will be implemented in Bandarban District by the Bandarban ...

14 Aug 2017 News
21 Stakeholders Trained in the Essentials of Climate Change in Chitwan

Other than being catalogued and bound into thick journals to gather dust, what is the use of high-level climate change ...

21 Feb 2018 KSL
Manual on Planning Management for Ecosystem Services Launched

The operations manual can be of use in most terrestrial environments of the world. Its purpose is to include ecosystem ...

11 Dec 2018 HIMAP
Mountains Matter in the IPCC Sixth Assessment Report Cycle

But things are changing. The Sixth Assessment Report (AR6) of the Intergovernmental Panel on Climate Change (IPCC) will feature a ...

26 Jul 2018 Solar Pumps
Fifty-three Solar-powered Irrigation Pumps Operational in Four Districts of Nepal

The pumps were installed by the International Center for Integrated Mountain Development (ICIMOD) with support from the Australian Department of ...