This site uses cookies, as explained in our terms of use. If you consent, please close this message and continue to use this site.
0 mins Read
A joint research team from CICERO, GRID-Arendal, ICIMOD, and other partners within the Himalayan Climate Change Adaptation Programme (HICAP) has initiated fieldwork on valuation of ecosystem services in the Koshi River Basin (KRB). A number of in-field stakeholder discussions helped deduce a possible mechanism for implementation of Payment for Ecosystem Services (PES) in the KRB.
While water was identified as a major ecosystem service in the basin, communities identified forest as a major contributor to water resource conservation and emphasized conserving and managing water sources through better management of forest once the PES mechanism is established.
Water is a major ecosystem service considered under the PES mechanism in both upstream and downstream areas of the Koshi River. In the Shardu watershed in downstream Koshi, the rural-urban linkage is instrumental in setting up a PES mechanism linking Dharan municipality and the water supply corporation.
Cultural and religious services will be considered at later stages while finalizing the valuation of ecosystem services.
The Chittagong Hill Tracts of Bangladesh hold great promise for the production and commercialization of non-timber forest products such as ...
Every year, the rainy season in the Chittagong Metropolitan Area (CMA), Bangladesh brings news of human causalities and property damage ...
Floods and flash floods in the Hindu Kush Himalaya cause considerable loss of lives and property, particularly during the monsoon. ...
On ...
The Nomadic Peoples journal invites paper submissions for a special issue on ‘Pastoral resilience and transformation in the Hindu ...
More than one-third of households have two to ten colonies of bees in traditional fixed-comb log-comb, wall-comb, or pitcher hives ...
The Kangchenjunga Landscape (KL) spreads over an area of 25,085.8 sq.km that is home to 7.2 million people. Nepal covers ...
In the aftermath of the Great Earthquake of 25 April that ripped through north-central Nepal, ICIMOD put together ...